Winter Park · Phase 2

Park Avenue
Refresh

Not For Construction

Map settings
Plan PDFs & sources
Electrical & interconnect plansElectrical set · 27 Oct 2026 · 7 sheetsFiber & signal interconnect · 18 Oct 2026E-1 · Partial Photometric Site PlanE-2 · Partial Photometric Site PlanE-3 · Partial Electrical Site PlanE-4 · Partial Electrical Site PlanE-5 · Electrical Schedules And DetailsE-6 · Electrical Schedules And DetailsE-7 · Electrical Schedules And Details

Coordination view; refer to the original drawings for construction. Signal PDF overlay alignment is approximate (within 3 ft). Short dashed electrical box joins are diagrammatic and excluded from quantities. Larger gaps remain open for review.

Future-phase drawing notes
2025 county aerial imagery
Preliminary Quantities

Updated 27 Oct 2026
Confirm quantities against final construction documents.

Light poles
37
18 west · 19 east
Pots
55
V5: 13 · V6: 29 · V7: 13
Trash cans
19
Recycling cans
5
Benches: Proposed/Existing
52 / 40
New Benches
15
Decorative bollards
87
Proposed; excludes 2 existing
Proposed trees
39
Includes 1 east-side live oak
Handrails - pending
16 CAD runs
75 LF unconfirmed; Bryan / Danny
Raised planters
19
Includes south-plaza planter
Demolition area
41,729 SF
Planter planting area
1,599 SF
Planters incl. walls
2,423 SF
Raised-planter walls
919 LF
North garden wall
54 LF
Opening excluded
Garden wall columns
2

Pole utilities

Pole outlet boxes
37
Street lighting boxes
37
Irrigation boxes
37
Fiber vaults
15
New panel N
1

Conduit · Total project length

Pole fiber · 2 inch
4,485 ft
Two conduits between vaults
Pole fiber · 1¼ inch
3,557 ft
Two conduits from vault to pole
Pole fiber total
8,042 ft
Dedicated network serving 37 poles
Pole outlet power · 1–2 inch
2,250 ft
One conduit shown; final size to confirm
Street lighting · size conflict
1,915 ft
One conduit; 2 inch legend / 1¼ inch detail
Irrigation · 1¼ inch
2,293 ft
One conduit shown

Total feet count every conduit, not just the route. Pole fiber: 2,243 ft between vaults and 1,779 ft from vaults to poles, with two conduits on each route. Vertical connections, waste and fiber cable excluded.

Signal interconnect proposal

Separate from pole fiber. Current and future quantities must be confirmed.

Fiber main · 1¼ inch
5,292 ft
Four conduits along 1,323 ft
Fiber branches · 1¼ inch
128 ft
Two conduits along 64 ft
Signal · 2 inch
945 ft
Bank plus pedestrian branches
Detection · 2 inch
945 ft
Bank plus pedestrian branches
Spare · 2 inch
816 ft
Two conduits on bank routes
Future pedestrian pedestals
12
Future equipment

Six pedestrian branches add 129 ft each of signal and detection conduit; no spare conduit on these branches.

Signal, detection and spare share one 408-foot bank route.

Signal equipment · Current phase

Pull boxes
42
Splice boxes
2
Controller cabinets
1
Concrete pads
2

SF = square feet · LF = linear feet

Quantity notes

Preliminary drawing takeoff. Confirm quantities before ordering or construction.

Handrails are pending Bryan Walters and Danny Rogers confirmation. Counts and lengths describe frozen CAD geometry, not confirmed construction quantities.

Power size: 1–2 inches. Lighting: 2 inches in the legend; 1¼ inches in the detail. Confirm final sizes.

Print summary Conduit plan & quantities
Loading drawing layers…
N
Zoom in for drawing labels